The list is a little overwhelming, so I have tried to break it down into phases (that’s the project manager coming through). Currently Wanda is located about an hour and a half away. The first goal is to get all of the major GRP repairs done. Once that is completed and Wanda is watertight she can be moved closer to me, where I can do the rest of the repairs myself.
Phase 1 – get the main structural repairs done, fix all the leaks so that she can be moved back outside on the hard, move her to a closer yard.
Item | Status |
Remove cabinetry to inspect hull
Exposing the fibreglass shell and stringers
|
. |
Arrange surveyor to view damage | Done |
Repair stress cracks | Done |
Rebuild rubbing rail | Done |
source teak for cap rail | In progress |
create template for missing cap rail | |
cut teak cap rail | |
install and bed cap rail | |
remove chain plates and all deck hardware | |
remove teak decking | |
lay down new teak deck | |
paint topsides | |